USAutomatic PATRIOT High Quality Low Voltage Vehicular Swing Gate Operator Solar or AC Charged PATRIOT I Single Swing Gate Operator PA
8STEP 4 Gate Bracket Installation (Prepare Actuator for Installation) NOTE: Do not operate the actuator before performing all installation steps.
9STEP 4c Gate Bracket Installation (PUSH to Open Only) The actuator is adjusted to the fully retracted or closed position from the factory. Once
10STEP 5 Mounting Control Box When deciding where to mount the control box remember the actuator cable for the master gate is 8 feet in l
11STEP 8 Installation of Charging Device SOLAR PANEL AND SOLAR CHARGE CONTROLLER Locate and mount the solar panel bracket so that the p
12STEP 9 Connecting Actuator Cable to Control Board Before connecting the actuator cable to the control board check the following: Verify that all
13STEP 11 Control Board Dipswitch Setting Verification NOTE: This check must be performed before operating the gate for the first time. Failure to
14STEP 13 Making Final Adjustments If the gate stopped short of the desired stop position on page 13, step 12, then the limit switch needs to
15Limit Switch Adjustment The limit switch adjustments are located on the bottom of the actuator. Remove the dust plug to make adjustments. A flat
16Circuit Board Terminal Description For Accessories Patriot Control Board TERMINAL DESCRIPTION 1 + 12 vdc Output. *Maximu
17FUNCTION OF PROGRAM SWITCH SETTINGS – DS1 DS1 Programming Dipswitches Factory settings are shown in bold italic type 1 Automati
18FUNCTION OF PROGRAM SWITCH SETTINGS – DS2 DS2 Programming Dipswitches Factory settings are shown in bold italic type 1 Solenoid loc
19STEP 16 RADIO EQUIPMENT INSTALLATION AND PROGRAMMING STEP 16a Oracle Enabled Operators Location of parts in Oracle Dual Frequency Gate Contro
20Total Remote/Transmitter Memory Deletion for Key Fob or Futura – 315 MHz • On the DFGCU, press and hold the learn button down until the LED is
21STEP 16c LCR Remote/Transmitter & Receiver (model 433DSR2LC) Programming The Transmitter and Receiver provided operate at 433 MHz. Receiver
22SAFETY SECTION USAutomatic gate operators are certified to UL-325 Vehicular Class I and Class II swing gate standards. UL-325 identifie
23WARNING: TO REDUCE THE RISK OF INJURY OR DEATH 1. READ AND FOLLOW ALL INSTRUCTIONS 2. Never let children operate or play with gate controls. K
24SAFETY SECTION Remedies for Safety Concerns Zone 1 Safety edges and photo electric eyes are the most common types of pr
25SAFETY SECTION Remedies for Safety Concerns Zone 3 Safety edges are the best protection. A photo eye may also be used. For veh
26Periodic Service All gate operators require periodic checking and adjustments, by a qualified technician of the control mechanism for force (load
27TROUBLESHOOTING SECTION OUTLINE 1 Single gate will not operate. 2 Dual gate will not operate. 3 Single or Dual gate opens or closes slowly. 4
1INTRODUCTION This operator is intended to be installed on vehicular Class I or Class II gates as defined by UL-325. Maximum gate load should not e
281. My single gate will not operate Patriot I: STEP 1 Remove control box cover. Locate the “Open/Close Command” push button and press it to oper
29and turn switch 3 off and switch 4 on. Then repeat step 2 and 3 again using X2 connector on control board in place of X1. STEP 4 If a problem i
30STEP 2 Verify that DS1 switch 1 is on. If not, turn it on and recheck gate operation. If gate remains open, continue with step 3. STEP 3 If you
31STEP 4 Once adjusted correctly, the open LED should be on when the gate is opened and the close LED should be on when the gate is closed. STE
32 STEP 2a If the “Push Button Input” LED did not come on in step 1 then make sure that the green J2 connector on the control board is securely conn
3312. Gate opens using transmitter, but will not close using transmitter (Low Current Receiver only) STEP 1 The problem is most likely the program
34Accessory Wiring Information USAutomatic Patriot gate operators are +12 vdc powered. Solar charged operators do not require 110 VAC for proper op
35Types of Accessories USAutomatic Patriot control boards are designed to operate with all accessories. Understanding the control board inputs and
36 Security Shunt – This a dry contact switch that is closed anytime the gate is not closed. A proximity switch such as the type installed in a secur
37
2Table Of Contents Page Introduction ... 1 Table of Cont
38USAutomatic PATRIOT I PATRIOT II Limited 5 Year Warranty The PATRIOT Gate Operator is warranted to be free of defects in materials or workman
3GENERAL REQUIREMENTS General hand/tools such as combination wrenches, tape measure, level, clamps, etc. are required. Your particular installatio
4IMPORTANCE OF A PROPERLY DESIGNED GATE As a general rule, an automatically operated gate must be stronger and smoother than a manually operated
5PARTS INCLUDED OR
6STEP 1 Hinge Mount Tube Installation Use the diagrams in Figure 1 below to determine the type of installation and gatepost required. These
7STEP 2a Hinge Mount Tube Installation (Push to Open Installation Top View) Use dimensions in figure 3 to determine mounting location of Hinge mount
Commentaires sur ces manuels