Controlled-products-systems-group 3265-267H Manuel d'utilisateur Page 10

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 72
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 9
Header Bracket
Chain Pulley
Bracket
Temporary
Support
Header Wall
Garage
Door
Rail
Clevis Pin
5/16"x2-3/4"
Ring Fastener
Header Bracket
Chain
Pulley
Bracket
Rail
10
Clevis Pin
5/16"x2-3/4"
Ring Fastener
INSTALLATION STEP 3
Attach the Rail to the Header Bracket
Position the opener on the garage floor below the
header bracket. Use packing material as a protective
base. NOTE: If the door spring is in the way you’ll need
help. Have someone hold the opener securely on a
temporary support to allow the rail to clear the spring.
Position the rail bracket against the header bracket.
Align the bracket holes and join with a clevis pin
as shown.
Insert a ring fastener to secure.
HARDWARE SHOWN ACTUAL SIZE
Vue de la page 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 71 72

Commentaires sur ces manuels

Pas de commentaire